Judging
Every nomination is read for three records first: safety, quality and delivery. The measures set for its category come second.
Judging
Judging panel
R. Carmichael
Panel Chair
Carmichael Governance
S. Adeleke
Corporate Lawyer
Adeleke Law
M. Salib
Compliance Officer
Salib & Co
A. Whitfield
Steering Committee Chair
ex-HSBC
B. Tane
Business Economist
Tane Advisory
T. Silva
Brand Analyst
Silva Insights
C. Merton
Leadership Coach
Merton Coaching
P. Sousa
Market Analyst
Sousa Research
Judging panel
Panel members will be listed here
Judges are appointed by the Council for their working experience in the sectors they assess. Their names and roles will appear on this page before judging begins.
Order of reading
The panel reads each nomination in a fixed order. It checks eligibility, then the safety record, the quality record and the delivery record, and only then the measures for the category.
A nomination that leaves out one of the three records is treated as incomplete and is not scored.
Safety record
- Injury and incident rates for everyone on the project or site, subcontractors included, with the hours worked behind them.
- Serious incidents in the period, how each was investigated and what changed as a result.
- Lead indicators such as near-miss reports, inspections and training completed.
- How the public and neighbours were protected, where the work affected them.
Quality record
- Defect, rework, scrap, yield or return figures that show conformance with specification.
- Non-conformances raised during the period and how they were closed out.
- Results of audits, inspections and tests carried out by clients or regulators.
- How the output has performed in use, where enough time has passed to tell.
Delivery record
- Completion, shipment or service dates set against the original baseline.
- Final cost against budget or contract sum, with client changes shown on a separate line.
- For operating businesses, measures such as on-time in-full rates or plant availability.
- The causes of any large variation and what was done to recover.
Category measures
Each group page lists the measures the panel reads after the three records. They include availability for energy networks, food safety audits for food producers, occupier feedback for property and completion rates for apprenticeship schemes.
Difficulty and scale
The panel weighs how hard the work was. A congested city site, severe weather or a live railway alongside are all taken into account when the records still hold up.
Results are read in proportion to the size of the organisation, so a small firm is not expected to show the management systems of a multinational.
Conflicts of interest
Judges declare any link with an entrant before reading begins. A judge with a link does not score that nomination or any other in the same category.
Confirming results
The Council checks each winning nomination against its supporting documents before the result is published. Winners are then listed on the Winners page with their category and a short citation.