Judging

Every nomination is read for three records first: safety, quality and delivery. The measures set for its category come second.

Judging

Judging panel

  • R. Carmichael

    Panel Chair

    Carmichael Governance

  • S. Adeleke

    Corporate Lawyer

    Adeleke Law

  • M. Salib

    Compliance Officer

    Salib & Co

  • A. Whitfield

    Steering Committee Chair

    ex-HSBC

  • B. Tane

    Business Economist

    Tane Advisory

  • T. Silva

    Brand Analyst

    Silva Insights

  • C. Merton

    Leadership Coach

    Merton Coaching

  • P. Sousa

    Market Analyst

    Sousa Research

Order of reading

The panel reads each nomination in a fixed order. It checks eligibility, then the safety record, the quality record and the delivery record, and only then the measures for the category.

A nomination that leaves out one of the three records is treated as incomplete and is not scored.

Safety record

  • Injury and incident rates for everyone on the project or site, subcontractors included, with the hours worked behind them.
  • Serious incidents in the period, how each was investigated and what changed as a result.
  • Lead indicators such as near-miss reports, inspections and training completed.
  • How the public and neighbours were protected, where the work affected them.

Quality record

  • Defect, rework, scrap, yield or return figures that show conformance with specification.
  • Non-conformances raised during the period and how they were closed out.
  • Results of audits, inspections and tests carried out by clients or regulators.
  • How the output has performed in use, where enough time has passed to tell.

Delivery record

  • Completion, shipment or service dates set against the original baseline.
  • Final cost against budget or contract sum, with client changes shown on a separate line.
  • For operating businesses, measures such as on-time in-full rates or plant availability.
  • The causes of any large variation and what was done to recover.

Category measures

Each group page lists the measures the panel reads after the three records. They include availability for energy networks, food safety audits for food producers, occupier feedback for property and completion rates for apprenticeship schemes.

Difficulty and scale

The panel weighs how hard the work was. A congested city site, severe weather or a live railway alongside are all taken into account when the records still hold up.

Results are read in proportion to the size of the organisation, so a small firm is not expected to show the management systems of a multinational.

Conflicts of interest

Judges declare any link with an entrant before reading begins. A judge with a link does not score that nomination or any other in the same category.

Confirming results

The Council checks each winning nomination against its supporting documents before the result is published. Winners are then listed on the Winners page with their category and a short citation.